Quick Facts

Countries:
Where the impacts of the investment may be experienced.
  • China
Location: Xinyu
Whenever identified, the area within countries where the impacts of the investment may be experienced. Exact locations of projects may not be identified fully or at all in project documents. Please review updated project documents and community-led assessments.
Banks:
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
  • Asian Development Bank (ADB)
Status: Active
Bank Risk Rating: A
Risk rating varies among banks and may refer only to the particular investment and not to the risk for the project as a whole. Projects marked 'U' have an 'Unknown' risk rating at the time of disclosure.
Board Decision Date: 2016-12-06
The estimate day the bank will vote on a proposed investment. The decision dates may change, so review updated project documents or contact the EWS team.
Borrower or Client: Government of People's Republic of China
The holder of the loan, grant, or other investment.
Sectors:
The service or industry focus of the investment. A project can have several sectors.
  • Water and Sanitation
Investment Type(s): Loan
The categories of the bank investment: loan, grant, etc.
Investment Amount (USD): $ 150.00 million
Value listed on project documents at time of disclosure. If necessary, converted to USD$. Please review updated project documents for more information.
Project Cost (USD): $ 300.39 million
Value listed on project documents at time of disclosure. If necessary, converted to USD$. Please see updated project documentation for more information.

Share This Page

 

Contact Us

Do you have more information on
this project, or want to get involved?
Contact EWS

Primary Source

Original disclosure @ ADB website
Updated in EWS: 2017-08-11
Disclosure Date: 2016-09-29
Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement
ADB-48055-002

Project Description
The project will demonstrate harmonization of development and flood and environmental management in the river basin that is a manageable size for project level intervention, using an integrated river basin model. One demonstration will be an introduction of innovative storm water management systems. Urban development increases storm water runoff by cutting trees and covering grounds with concrete or asphalt. Innovative storm water management systems reduce peak storm water runoff by promoting storm water infiltration into soil and increasing storm water retention. The demonstration and the river basin model can be replicated in other many similar-sized river basins, particularly where development is anticipated. Potential climate change impact assessment and sensitivity analysis of flood control structures' capacities will be conducted based on climate change modeling. The use of sensitivity analysis to examine potential climate change impacts and risks of flood control structures can be also replicated to other projects. The project will help XCG review Xinyu City Master Plan for 2008 6 2030 and revisit city's infrastructure planning, which will be another ADB's value addition.The project is consistent with (i) a decision of the Third Plenary Session of the 18th Central Committee of the Communist Party of China held in Beijing in November 2013, which supports construction of eco-civilization and establishment of a system to protect ecological environment; (ii) ADB's recommendations for preparation of the Thirteenth Five-Year Plan of the People's Republic of China (PRC), 2016 2020, and ADB's upcoming Country Partnership Strategy for the PRC, 2016 2020, which supports or seems to support improvement of water security; (iii) ADB's strategy 2020 and the midterm review of the strategy that prioritize natural resource management; , and (iv) ADB's Water Operational Plan, 2011 2020 which prioritizes integrated water resources management and efficiency and productivity in the delivery of water services.ADB has been supporting projects on flood, waterlogging, and environmental management in the PRC and other countries. Lessons learned from those projects, such as international best practices for flood and waterlogging management, and nonstructural measures for flood and environmental management will be reflected in the project design. IMPACT 1) Life quality in Xinyu improved (Xinyu City Master Plan for 2008-2030) 2) Integrated and climate-resilient flood and environmental management in Kongmu River Watershed replicated to other river watersheds (Defined by project) OUTCOME Integrated and climate-resilient flood and environmental management in Kongmu River watershed demonstrated CONSULTING SERVICES All ADB-financed consultants will be hired following ADB's Guidelines on the Use of Consultants (2013, as amended from time to time). PROCUREMENT All ADB-financed procurement will be conducted following ADB's Procurement Guidelines (2015, as amended from time to time).
Investment Description
Contact Information
Xinyu City Government 124519972@QQ.COM No. 1388, Yanjiang Road, Xinyu City Jiangxi Province, PRC ACCOUNTABILITY MECHANISM OF ADB The Accountability Mechanism is an independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by an Asian Development Bank-financed project. If you submit a complaint to the Accountability Mechanism, they may investigate to assess whether the Asian Development Bank is following its own policies and procedures for preventing harm to people or the environment. You can learn more about the Accountability Mechanism and how to file a complaint at: http://www.adb.org/site/accountability-mechanism/main