Quick Facts

Countries:
Where the impacts of the investment may be experienced.
  • Kenya
Banks:
International, regional and national development finance institutions. Many of these banks have a public interest mission, such as poverty reduction.
  • Multilateral Investment Guarantee Agency (MIGA)
Bank Risk Rating: A
Risk rating varies among banks and may refer only to the particular investment and not to the risk for the project as a whole. Projects marked 'U' have an 'Unknown' risk rating at the time of disclosure.
Board Decision Date: 2014-04-29
The estimate day the bank will vote on a proposed investment. The decision dates may change, so review updated project documents or contact the EWS team.
Borrower or Client: Standard Bank
The holder of the loan, grant, or other investment.
Potential Rights Impacts:
Only for projects receiving a detailed analysis, a broad category of human and environmental rights and frequently at-risk populations.
  • Healthy Environment
  • Labor & Livelihood
  • Right to Food
  • Right to Health
  • Right to Water
Investment Amount (USD): $ 43.70 million
Value listed on project documents at time of disclosure. If necessary, converted to USD$. Please review updated project documents for more information.

Share This Page

 

Contact Us

Do you have more information on
this project, or want to get involved?
Contact EWS

Primary Source

Original disclosure @ MIGA website
Updated in EWS: 2017-06-22
Disclosure Date: 2014-02-27
Gulf Power Limited
MIGA-10646

Project Description
Project Description This summary covers financing from Standard Bank of South Africa to Gulf Power Limited in Kenya. Standard Bank has applied for a MIGA guarantee of €31.9 million ($43.7 million equivalent) for a period of up to 20 years against the risk of war and civil disturbance. Gulf Power Limited is developing an 80 megawatt heavy fuel oil diesel power plant, including a 66 kv interconnector and backup-metering equipment on a 20 year build-own-and-operate basis. The project will have a 20 year power purchase agreement with Kenya Power and Lighting Company (KPLC), the national transmission and distribution company. In 2009, KPLC invited bids for the design, financing, supply, erection, commissioning, operation, and maintenance of three new 60 to 80 megawatt medium-speed diesel electricity generating plants. The plants are to be located in the Athi River region, which is approximately 20 kilometers from Nairobi. Gulf Energy Limited won the bid to build one power station. Environmental Categorization The project is a category A under MIGA’s Policy on Environmental and Social Sustainability. An environmental and social review summary (ESRS) for the project was prepared by the International Finance Corporation (IFC) in 2011. The Board approved the IFC Project in October 2012, and the IFC invested in December 2013. The IFC undertook a pre-investment appraisal mission in November 2013, which confirmed that the 2011 ESRS is still valid as construction has not yet started, environmental and social conditions at the site are consistent with those presented in 2011, and the design of the project has not materially changed. Click here to view the ESRS prepared by IFC. The project is also supported by a partial risk guarantee from the World Bank’s International Development Association. Development Impact The World Bank’s Africa Infrastructure Country Diagnostic found that the lack of adequate, reliable electricity supply is Kenya’s largest infrastructure challenge and a key constraint to economic growth (contributing to economic losses of an estimated 2 percent of GDP). The project will help Kenya achieve a more diversified energy mix and stability to its power generation. The country remains heavily dependent on hydropower, which is frequently negatively impacted by drought. Installed thermal capacity provides a less expensive alternative to investments in emergency diesel-fired plants. MIGA’s proposed guarantee is aligned with the agency’s strategy of supporting investments in countries eligible for lending from the International Development Association, investments in complex projects, and South-South investments.
Investment Description
Contact Information
ACCOUNTABILITY MECHANISM OF MIGA The Compliance Advisor Ombudsman (CAO) is the independent complaint mechanism and fact-finding body for people who believe they are likely to be, or have been, adversely affected by an IFC or MIGA- financed project. If you submit a complaint to the CAO, they may assist you in resolving a dispute with the company and/or investigate to assess whether the IFC is following its own policies and procedures for preventing harm to people or the environment. If you want to submit a complaint electronically, you can email the CAO at CAO@worldbankgroup.org. You can learn more about the CAO and how to file a complaint at http://www.cao-ombudsman.org/